You don't have javascript enabled. Good luck with that.
Pencarian
 20 Bak Kontrol di Pulau Kelapa Dikeruk

20 Control Tubs on Kelapa Island Dredged

The Blue Taskforce personnel of Seribu Island Water Resource Sub-agency dredged 20 control tubs of water channel on Kelapa Island, RW 01, Kelapa Island Urban Village, Seribu Utara Island Sub-district.

20 sacks of mud were transported from the control tubs

Seribu Island Water Resource Sub-agency Head, Mustajab, said the dredging is part of maintenance and cleaning the mud and trash.

Flamboyan Connecting Channel in Cengkareng Timur Dredged

"There are 20 sacks of mud were transported from the control tubs," he said, Friday (8/23).

The dredging of the control tubs involved six personnel by using manual tools.

According to him, the dredging will still be run on Kelapa Island starting from RW 01 up to RW 04.

"There are 75 control tubs in total here on Kelapa Island," he added.

It is hoped the newly dredged control tub will also prevent thee area to be inundated during rainy season.

Meanwhile, one of RW 01 residents, Kelapa Island Urban Village, Kinam (37), supported and appreciated the inundation prevention run by Blue Taskforce personnel.

"Hopefully it will also eradicate mosquito nest inside the control tubs," he stated.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1297 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1128 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye291 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing